Bowoze Waterproof Tile Gap/Crack/Grout Filler Water Resistant Silicone Sealant for DIY Home Sink Gaps/Tiles Gaps/Grouts Repair Filler Tube (180 Ml White) Crack Filler(180 g) | Zipri.in
Bowoze Waterproof Tile Gap/Crack/Grout Filler Water Resistant Silicone Sealant for DIY Home Sink Gaps/Tiles Gaps/Grouts Repair Filler Tube (180 Ml White) Crack Filler(180 g)

Bowoze Waterproof Tile Gap/Crack/Grout Filler Water Resistant Silicone Sealant for DIY Home Sink Gaps/Tiles Gaps/Grouts Repair Filler Tube (180 Ml White) Crack Filler(180 g)

Quick Overview

Rs.550 on FlipkartBuy
Product Price Comparison
Additional information How to Use : 1-Scope of application: Suitable for tile joints, mosaic joints, corners of toilets, corners of counters, floors. , Beautification of toilet floor and other gaps, as well as continuous staining, blackening, repair of essential bricks, tile cracks, etc., with excellent performance of waterproofing, non-blackening, scrubbing resistance and discoloration. Main ingredients: resin, magnesium silicate, calcium silicate, water, etc. After filling in the agent, use the beauty joint agent 2. Stir the beauty grout for about 20 seconds, cut the tip diagonally, then align the bevel with successive intervals, and gently squeeze the paste. (Note: You can also paste masking paper along the edge of the tile., And then squeeze the paste, and tear the paste after it is flattened) 3. After the paste is flattened, it can be dried naturally. It is recommended that the drying time is 3-7 Hrs, and water should not be used. 4. This Product expiry date : one year from production date. For larger or deeper intervals you can apply it several times every other day during this period. 5. This product can be used multiple times after opening, but remember to tightly control the cap of the bottle and store it in a cool and ( Note: 1. Try a small area in an inconspicuous place before use, and use it normally after an adverse reaction does not occur. 2. Use Depending on the environment and temperature, it takes 4-5 hours to cool the surface in summer and 2-3 days in winter. Drying time is 3-7 Hrs (this will be prolonged or shortened due to the effect of environment, temperature, temperature and other factors). 3. Construction temperature should not be less than 10 ?, so as to avoid cracks, holes, etc., which will affect the manufacturing effect of the product. It is recommended to be used in a warm room in winter, and children should avoid contact. If it goes into your eyes, do not rub it. Rinse immediately with clean water and seek medical attention.