The Miami Valley Flood-Protection Work: Five Articles Published in Engineering News During January and February 1917: Fixing Maximum Flood Limits, Why Retarding Basins Were Adopted, Dam and Outlet Problems, Study of Retarding-Basin Operation, New Features(English, Hardcover, District Miami Conservan | Zipri.in
The Miami Valley Flood-Protection Work: Five Articles Published in Engineering News During January and February 1917: Fixing Maximum Flood Limits, Why Retarding Basins Were Adopted, Dam and Outlet Problems, Study of Retarding-Basin Operation, New Features(English, Hardcover, District Miami Conservan

The Miami Valley Flood-Protection Work: Five Articles Published in Engineering News During January and February 1917: Fixing Maximum Flood Limits, Why Retarding Basins Were Adopted, Dam and Outlet Problems, Study of Retarding-Basin Operation, New Features(English, Hardcover, District Miami Conservan

Quick Overview

Rs.1470 on FlipkartBuy
Product Price Comparison